
The Projects
The Mission
We exist to bridge the gap between high-potential African projects and the global capital they deserve.

Built in Nairobi · Designed for East Africa
A vertically integrated wood-plastic composite (WPC) door manufacturing platform in Nairobi, built to replace slower, higher-cost imported premium doors and to serve East Africa through a dealer and distributor network. PlanetSkyCapitalAdvisory is advising on transaction structuring and investor engagement.
INVESTMENT THESIS
40–50% lower price target with local manufacturing.
2–3 weeks for customisation versus 8–12 weeks for imports.
Kenya first, followed by Uganda and Tanzania from Year 3.
The core bet: A durable local product can take share from slower, higher-cost imported doors.
MARKET OPPORTUNITY
Management estimates for East Africa, 2024 to 2029.
| Segment | 2024 | 2029 | CAGR |
|---|---|---|---|
| Building materials | USD 12.5B | USD 17.8B | 7.2% |
| Doors & components | USD 890M | USD 1.3B | 8.5% |
| WPC / eco composites | USD 145M | USD 260M | 12.3% |
| Kenya residential construction | USD 3.2B | USD 4.9B | 9.1% |
PRODUCT

Weather-resistant construction for coastal and humid markets.
No painting, staining or varnishing required.
Wood-grain aesthetics with optional fire-rated cores.
COMPETITIVE POSITION
Price, delivery and durability improve at the same time.
35–40%target material-cost advantage from in-house extrusion.
MANUFACTURING SYSTEM

Wood fibre, polymers and additives
Profiles shaped at controlled temperature
5-axis CNC and frame assembly
UV curing, edge-banding and hardware
Load, water and thermal cycling
GO-TO-MARKET
Target volume mix at Phase 1. Illustrative midpoint of ranges; totals rounded.
Regional rollout
REVENUE MODEL
Management projection. No selling-price inflation is assumed in the source brief.
Revenue figures below are blurred until access is granted.
CAPITAL PLAN & STRUCTURE
Use-of-funds and investment terms below are blurred until access is granted.
A blended USD 3.0M plan of equity, subordinated debt and a working-capital facility.
ENERGY & IMPACT
250 kWp grid-tied solar targeted by Year 2.

Targets require technical validation, tariff confirmation and final solar quotations.
EXECUTION PLAN
Close investment
Factory & permits
Order & ship
Line commissioning
Pilot & approvals
Deliver first orders
DILIGENCE GATES
All commercial, market and financial figures are management estimates and projections from the sponsor's investment brief (September 2026). Independent commercial, legal, technical and financial diligence remains required before investment. This is not an offer or a valuation.
ENQUIRE ABOUT THIS MANDATE
Request the full investor pack, arrange a confidential briefing, or ask us a question. Our team will reply personally by email or WhatsApp.
You can ask us to
Looking for the detailed figures?
Pricing and financial tables on this page are shown to approved investors only. Request access or enter your code.